亚日韩在线视频官网,亚洲a∨天堂无码麻豆电影,人妻超清中文字幕乱码一区,青青草原精品国产亚洲AV

高密市萬(wàn)豪機(jī)械有限公司
  • 高密市萬(wàn)豪機(jī)械有限公司
  • 高密市萬(wàn)豪機(jī)械有限公司
  • 高密市萬(wàn)豪機(jī)械有限公司
Product classProduct class
Gaomi Wanhao Machinery Co., Ltd.

Contact: Manager Guo

Mobile:13646362678

Tel:0536-2757298

URL:wanhaojixie.cn

Mailbox:wh@wanhaojixie.cn

Address: Xiazhuang Industrial Park, Gaomi City, Shandong Province, China

current position:Home> News>Summary of construction experience of ductile iron pipe fittings
Pageviews:569 Release date:2021-10-12 0:00:00

Summary of construction experience of ductile iron pipe fittings

No matter which industry you are in, over time, you will always accumulate some relevant experience in these industries. The same is true for the construction of ductile iron pipe fittings. The staff have been working in this post for a long time and have an understanding of its construction requirements and precautions. Let's take a look at the summary of their construction experience, which is as follows:

Construction of ductile iron pipe fittings

1. If the construction is in summer, vegetable oil should be used as the lubricating oil, and the joints can be covered with soil. If it is a cold winter, the rubber ring can be preheated with hot water. The purpose of this is to reduce the hardness to ensure rapid installation.

2. Before installation, the rubber ring can be soaked with water to better complete the installation work.

3. If you need to borrow the pipe during installation, if the rotation angle of the pipe itself cannot be satisfied, you can borrow the rotation angle according to the required angle. After calculation, cut the pipe socket and oblique the opening, which can increase the borrow rotation. Angle, and can ensure safe use.

4. If there is no condition to test the pressure with water, you can also consider using air to test the pressure.

5. Three links and elbows must be made of concrete buttresses. The trench backfill should be compacted in layers. If the pipeline crosses the road, in order to avoid crushing the pipe body, coarse sand can be backfilled to the top of the pipe.

6. In order to avoid the phenomenon of interface dripping during construction. During installation, the construction should be carried out in strict accordance with the specifications, and each pipe should be installed in place. For large-diameter pipes, the condition of each joint apron should be checked.

In fact, there are many points that need to be paid attention to during construction. Here is a brief introduction to some frequently encountered problems that need to be paid attention to during construction. The above information is a summary of the construction experience of ductile iron pipe fittings. I hope it will be helpful to you during your operation! 
與此原文有關(guān)的更多信息要查看其他翻譯信息,您必須輸入相應(yīng)原文

 
 Shandong Gaomi Marriott Machinery Co., Ltd

Address: Xiazhuang Industrial Park, Gaomi City, Shandong Province, China 

Contact: Manager Guo Mobile: 13646362678 URL:wanhaojixie.cn

Tel: 0536-2757298  技術(shù)支持:企化網(wǎng)絡(luò) 魯ICP備16040285號(hào)-1

巨鹿县| 平阴县| 北宁市| 府谷县| 西昌市| 广宗县| 巴楚县| 林芝县| 贺州市| 闽侯县| 南宁市| 丰都县| 同心县| 富锦市| 翼城县| 尚志市| 洪江市| 顺平县| 宜都市| 合阳县| 武清区| 新化县| 延边| 城口县| 武平县| 乐都县| 莱西市| 卢湾区| 安宁市| 民和| 汉川市| 深圳市| 利川市| 凤冈县| 红安县| 清原| 东台市| 德令哈市| 华蓥市| 卢龙县| 平阴县|