current position:Home> News>How to stack ductile iron pipes reasonably
Pageviews:656 Release date:2021-10-12 0:00:00

How to stack ductile iron pipes reasonably

After the ductile iron pipe is produced or transported to a certain place, it needs to be stacked accordingly so that it does not take up too much space. Although its performance is relatively good, but also pay attention to the stacking method and method, on the one hand to ensure its quality problems, on the other hand to ensure safety. Let's take a look at the correct stacking method of the pipe fittings together!

Ductile iron pipe stacking

1. At the beginning of stacking, it should be stable. Under the condition of ensuring safety, stacking should be based on the variety and specifications to prevent confusion and mutual corrosion.

2. The bottom of the ductile iron pipe stack should be high, firm and flat to prevent the material from being damp or deformed. If the warehouse is a sunny cement floor, it can be raised by 0.1m; if it is muddy, it must be raised by 0.2~0.5m. If it is an open field, the cement floor should be raised by 0•3~0.5m, and the sand and mud surface should be raised by 0.5~0.7m.

3. Do not store items that are corrosive to steel near the stacking position, otherwise the pipe fittings will be corroded.

4. Stack height requirements: manual operation does not exceed 1.2m, mechanical operation does not exceed 1.5m, and stack width does not exceed 2.5m.

5. For section steel stacked in the open, there must be wooden mats or stones underneath, and the stacking surface should be slightly inclined to facilitate drainage. Pay attention to the materials to be placed flat and straight to prevent bending and deformation. Angle steel and channel steel should be stacked in the open air, that is, the mouth should be facing down, the I-beam should be placed upright, the I-slot surface of the steel should not be facing upwards, and nodular cast iron pipes should be used to prevent water from rusting.

In addition, after ensuring the above stacking methods, it should be noted that there should be a certain passage between the ductile iron pipe stacks and the stacks. The inspection channel is generally 0.5m. The access channel depends on the size of the material and the transportation machinery. 1.5~2.0m. This is to better ensure the safety of palletizing. 
與此原文有關(guān)的更多信息要查看其他翻譯信息,您必須輸入相應(yīng)原文

 
 Shandong Gaomi Marriott Machinery Co., Ltd

Address: Xiazhuang Industrial Park, Gaomi City, Shandong Province, China 

Contact: Manager Guo Mobile: 13646362678 URL:wanhaojixie.cn

Tel: 0536-2757298  技術(shù)支持:企化網(wǎng)絡(luò) 魯ICP備16040285號(hào)-1

修文县| 大理市| 闵行区| 海兴县| 仪征市| 顺昌县| 三江| 滨州市| 萨嘎县| 许昌县| 西吉县| 凤翔县| 香港| 甘南县| 策勒县| 屯昌县| 武夷山市| 南雄市| 毕节市| 磴口县| 杭州市| 屏东市| 育儿| 莱阳市| 广安市| 临海市| 牟定县| 吉木萨尔县| 盐源县| 东城区| 晋州市| 平潭县| 黎川县| 遵义市| 临湘市| 杭锦后旗| 大渡口区| 潍坊市| 宿州市| 水富县| 湟中县|